Have You Also Encountered “This Problem and Difficulty”?
During the three-day 2024 Touch Taiwan exhibition, a well-known domestic company visited the Allion Smart AI Solution Exhibition Area. Through the on-site AI Test Solution demo, the company learned that Allion’s consulting services could assist them in developing smart display products.
After an online meeting, the Allion consulting team learned that the client’s products are produced by an Original Design Manufacturer (ODM), which is responsible for all quality management. The company faces the pressure of maintaining its brand standards but lacks sufficient resources for quality management. During the meeting, the client explained to Allion their development schedule, current R&D progress, and the issue of being unable to complete quality confirmation on time with only one sample and limited time.
2024 Touch Taiwan_ Consultation
Allion Smart Display AI Test Solution
In this regard, Allion’s consulting team recommended the Allion Smart Display AI Test Solution, which can solve the difficult problems faced by customers. Considering the development progress of this product, the consulting team focused on the following directions for verification and evaluation:
- Verify the four major functions: input switch, wireless, Bluetooth and voice assistant
- Execute long, varied and complex user scenario testing
- Evaluating the usage scenarios of the product in both single and integrated functions to assess the overall quality of the product’s hardware and software
Extended reading: Allion Critical Scenario Test Solution (ACSTS) | Allion Labs
Create Value and Solve Product Problems
With a sample and remote control provided by the customer, Allion took 5 working days to carry out customized revisions and trial runs to ensure that the AI solution could successfully operate the prototype and perform bug identification. With the solution, the time required for quality validation is significantly reduced:
- The workload that originally required engineers to perform 8 hours a day over 24 working days can be completed in 8 working days through AI Solution’s continuous 24-hour operation, reducing the schedule by 67% (16 days).
- Engineers only need 8 hours of manual work to confirm the execution results, saving 96% (184 hours) of manpower time.
In addition, although the product development process is approaching the Production Validation Test (PVT) stage, Allion still helped customers find up to 12 problems, including:
- Three of these problems should have been discovered during the early QA Basic Function validation.
- Four of these issues were successfully identified through Allion’s methodology know-how.
- The remaining five problems occur with varying probabilities (1%, 10%, 20%, etc.). These probabilistic issues can only be reproduced with the Allion Smart Display AI Solution to execute dozens or even hundreds of user scenarios. This can only be achieved with the solution; it is impossible to arrange manpower to complete the test manually.
Faster! Easier! Better!
This case explains that when you face any problem, despite limited time, limited samples, or insufficient internal resources, the Allion consulting team can provide effective solutions to help achieve Time to Market with Quality.
For more information about the smart display AI test solution and verification services, please feel free to contact Allion for a consultation.