With the booming development of the Internet of Things, the application scenarios of various ecosystems have become increasingly complex. Various manufacturers are racking their brains and striving to design the best quality plans. However, due to limited time and resources, these projects are often difficult to complete as scheduled!

With the quality test plan in hand, why are wireless base stations still disconnected frequently?

A well-known foreign Carrier /ISP manufacturer originally sought the help of Allion’s consulting team in formulating a ” quality plan for the smart home ecosystem ” However, due to customer complaints received from the market, the wireless base they provided to users The station will be disconnected from time to time, causing users to call customer service multiple times a day to report! The company’s QA department has also confirmed that the wireless base station product has completed acceptance testing, so there should be no quality issues.

Therefore, the customer immediately added new requirements and asked the Allion team to help review the existing quality testing plan and propose improvement suggestions!

Quality test plan diagnosis: Revealing five major improvement points

Allion’s consulting team has observed in cooperation with many manufacturers that the quality of various manufacturers’ products has matured, and problems rarely occur in a single-function operation situation in a short period of time. However, when products are introduced into various application ecosystems and used in tedious situations for a long time, users often encounter problems one after another! How to detect these problems in the product design stage is indeed a problem that manufacturers face.

After reviewing the test plan provided by the customer, the Allion consulting team pointed out the following shortcomings:

  • Too much repetitive testing of a single function
  • Lack of integrated situational simulation
  • Lack of performance confirmation of wireless base stations
  • Shortcomings of smart home simulation usage scenarios
  • contextual simulation for use across diverse application ecosystems

The improvement plan is urgent! Overturning corporate dilemmas

Allion’s consulting team proposed the following improvement plans:

– Add integrated scenario testing

  • Integrated usage scenarios using Best Practice Methodology

– Confirm wireless base station performance

  • Use Allion AWE AI Test Solution’s test plan can shorten the verification process by 60% and improve test efficiency
  • AWE Wireless Device Solutions

– Smart home usage scenario simulation

  • Using Allion’s SmartDisplay AI Test Solution to simulate the situation in which wireless base stations are used, the time can be shortened by 60%, and test efficiency can be improved.
  • Allion Critical Scenario Test Solution (ACSTS)

– Total quality plan optimization

  • Remove duplicate test content
  • Increase usage scenarios for effective application ecosystems

Faster ! Easier! Better!

For more than 30 years, Allion’s consulting team has worked closely with leading brand manufacturers in various industries to accumulate a huge database from SPEC confirmation, standard certification and evidence collection, and user scenario simulations in various application ecosystems. In addition, Allion’s consulting team also continues to evolve the Best Practice Methodology through regular data analysis, so that the overall product quality plan can be executed more efficiently, shorten the overall timeline, and improve overall output efficiency!

When you face any demand, Allion’s consulting team can create the most cost-effective solution for you, so that your products can achieve the Time to Market with Quality goal as scheduled!